Mark B. Whitaker Water Treatment Plant Intake Modifications

Engineered by Knoxville Utilities Board (KUB)

$173,000.00 | Knoxville, TN


Install temporary single PVC chlorine dioxide diffuser (similar to design for new diffusers) with supports and connect to existing supply line—locate and support diffuser at center of existing gate opening; remove existing chlorine dioxide diffuser and support assembly; install temporary plywood panels on existing trash screen to enable water treatment withdrawal from existing flow control gate opening levels; remove existing gate, clean gate guide channels and furnish and install new gates; furnish and install new chlorine dioxide diffuser assemble and supports—connect to chlorine dioxide supply pipe; remove temporary plywood panels, temporary chlorine dioxide diffuser and supports; demonstrate gate removal and plate removal/installation; and miscellaneous project completion and clean-up.

Employees are our greatest resource, and Haren Construction is fully committed to their safety. With our safety program and full-time safety manager, we work hard to provide every employee with safe working conditions. Working in the water and waste treatment field, we partner closely with our clients to ensure the safety of every jobsite and the public at large.