Crabtree Creek Lift Station Expansion

Engineered by Hazen and Sawyer for City of Raleigh

$6,282,500.00 | Raleigh, NC


This project includes the replacement of five screw pumps with higher capacity pumps. The project also includes extensive rehabilitation of the screw lift station structure. The pump replacement and the rehabilitation require a temporary bypass pumping and piping system to facilitate the construction. The project also includes a new power center, transfer switch and a new PLC. Integration of all existing and new controls to the PLC is also required.

Employees are our greatest resource, and Haren Construction is fully committed to their safety. With our safety program and full-time safety manager, we work hard to provide every employee with safe working conditions. Working in the water and waste treatment field, we partner closely with our clients to ensure the safety of every jobsite and the public at large.