Hyattown Pumping Station

Engineered by Hazen and Sawyer for Davidson Water, Inc.

Approximate Construction Cost $4.3 Million | Lexington, NC

Projected Timeframe: COMPLETE


Work on this project includes furnishing all equipment, superintendence, labor, skill, material, and all other items necessary for the construction of a masonry block water booster pumping station; the installation of (8) Owner-furnished 200 HP vertical turbine can pumps; 2 bladder-type surge tanks; and associated process valves and piping, electrical, HVAC, and instrumentation.