This project primarily consists of the following: The installation of a 16-Inch Raw Water Intake Line and By-Pass, along with a 6-Inch Drain Line. The scope also includes modifications of the Intake Structure, Siltation Basin, and Pump Station, as well as various valve replacements and other improvements along the Water Main and at the Plant. Additionally, the work includes miscellaneous improvements, and requires the furnishing of all materials, labor, equipment, and related appurtenances needed to complete the project.