Burnsville Wastewater Treatment Plant Rehab

Engineered by Withers Ravenel for Town of Burnsville

Approximate Construction Cost $12.5 Million | Burnsville, North Carolina

Projected Timeframe: Winter 2026


This project primarily consists of the following: the replacement of the existing Fine Screens and Aerated Grit removal system, the replacement of existing 0.5 MGD Contact Stabilization Treatment system with 0.5 MGD extended air process with a new detached Chlorine Contact Basin, the replacement of the existing Gaseous Chlorine and Sulfur Dioxide systems with Liquid Sodium Hypochlorite and Sodium Bisulfite Feed systems, and the rehabilitation of the existing 0.5 MGD Concrete Structure and conversion to an Equalization Basin and Aerobic Digester.