Ozark Point WTP and ZOP Improvements

Engineered by Crist Engineers, Inc. for Central Arkansas Water

Approximate Construction Cost $3.7 Million | Little Rock, Arkansas

Projected Timeframe: Summer 2026


This project primarily consists of the following: installation of new Liquid Lime and Liquid Zinc Orthophosphate Feed Systems and decommissioning and removal of the existing Hydrated Lime System. The scope includes construction of a new Lime Storage/Feed Building, Electrical/Controls and valving and piping related work.