Raw Water Intake Pump Repair

Engineered by Salt Engineers & Planning for Clinton Water Department

Approximate Construction Cost $1 Million | Clinton, Arkansas

Projected Timeframe: Summer 2026


This project primarily consists of the following: the furnishing and installation of a ASTM A53 Type S, Schedule 10 encasement pipe, tee type intake screens and pneumatic actuated isolation valves, and a compressed air system (compressor, controls, ancillaries, and compressed air piping) for the pneumatic actuators, the demolition and disposal of the existing steel encasement, mobilization, sitework, and electrical and controls.